Click to download into MS Excel
Download
Instream Habitat Treatments By Type      
  Grantee FFY 3rd Field HUC Instream Habitat
Treatment Type
Instream Habitat
Projects
  ADFG 2005 Kenai Peninsula Signage 1
      Klawock River Other 1
      Southcentral Alaska Bank stabilization 2
        Other instream treatment 1
      Southeast Alaska Bank stabilization 3
        Channel connectivity 1
        Fish barrier removal 1
        Log control (weir) 1
        Maintenance of previously installed structures 1
        Rock control (weir) 1
        Sediment removal 1
        Signage 1
        Site maintenance 1
    2004 Kenai Peninsula Bank stabilization 5
        Other 1
        Signage 5
        Woody debris placement 4
      Klawock River Bank stabilization 1
        Other 1
        Other stabilization treatment 1
      Southcentral Alaska Bank stabilization 1
    2003 Southcentral Alaska Bank stabilization 1
    2002 Central Southeast Alaska Bank stabilization 1
        Channel reconfiguration 1
        Signage 1
        Spawning gravel placement 1
        Woody debris placement 1
      Klawock River Other 1
    2001 Central Southeast Alaska Bank stabilization 1
        Woody debris placement 1
  CDFG 2006 Not Reported Channel connectivity 1
        Maintenance of previously installed structures 1
        Rock gabions 5
        Woody debris placement 5
    2005 Klamath Bank stabilization 1
        Boulders 1
        Deflectors/barbs 1
      Not Reported Bank stabilization 20
        Boulders 2
        Boulders placed in stream 2
        Brush bundles 2
        Channel connectivity 1
        Channel reconfiguration 5
        Concrete weir construction 1
        Deflectors/barbs 12
        Log control (weir) 1
        Maintenance of previously installed structures 1
        Other instream treatment 2
        Other stabilization treatment 1
        Pools created 1
        Rock control (weir) 3
        Site maintenance 2
        Spawning gravel placement 1
        Woody debris placement 20
    2004 Northern California Coastal Bank stabilization 4
        Channel reconfiguration 1
        Deflectors/barbs 2
        Woody debris placement 1
      Not Reported Bank stabilization 26
        Boulders 2
        Boulders placed in stream 3
        Channel reconfiguration 1
        Deflectors/barbs 18
        Install sediment-trap dam 1
        Maintenance of previously installed structures 1
        Off-channel ponds 2
        Other 4
        Other stabilization treatment 2
        Rock control (weir) 3
        Rock gabions 1
        Site maintenance 1
        Woody debris placement 17
      San Francisco Bay Site maintenance 1
    2003 Northern California Coastal Bank stabilization 1
        Boulders placed in stream 1
        Deflectors/barbs 1
        Pool created using scour structure 1
        Rock control (weir) 1
        Woody debris placement 1
      Not Reported Bank stabilization 31
        Boulders 2
        Boulders placed in stream 4
        Channel connectivity 1
        Channel reconfiguration 7
        Deflectors/barbs 15
        Install sediment-trap dam 1
        Log control (weir) 1
        Other 1
        Pool created using scour structure 6
        Rock control (weir) 7
        Rock gabions 4
        Site maintenance 5
        Spawning gravel placement 2
        Woody debris placement 15
      San Francisco Bay Bank stabilization 2
        Deflectors/barbs 1
    2002 Northern California Coastal Bank stabilization 3
        Boulders 1
        Boulders placed in stream 2
        Channel reconfiguration 1
        Deflectors/barbs 2
        Fish ladder improvement 1
        Other instream treatment 2
        Other stabilization treatment 1
        Pool created using scour structure 1
        Rock control (weir) 1
        Woody debris placement 2
      Not Reported Bank stabilization 56
        Boulders 3
        Boulders placed in stream 21
        Channel reconfiguration 3
        Deflectors/barbs 25
        Log control (weir) 1
        Other 1
        Other instream treatment 2
        Pool created using scour structure 10
        Pools created 1
        Rock control (weir) 18
        Rock gabions 7
        Site maintenance 10
        Spawning gravel placement 1
        Woody debris placement 29
      San Francisco Bay Maintenance of previously installed structures 1
    2001 Not Reported Bank stabilization 34
        Boulders 3
        Boulders placed in stream 7
        Channel reconfiguration 2
        Concrete weir construction 1
        Deflectors/barbs 23
        Fish ladder improvement 1